What do you want to achieve?
Centers for Disease Control Building 18
Atlanta, Georgia
Client:
CUH2A
Size:
440,000 sq.ft. (40,876 m²)
BSL 4 & 3Ag: 18,200 sq.ft.
(1 690.78 m²)
Construction Cost:
$165 million
Completion Date:
2006
Centers for Disease Control
Completed in 2006, the project provided Smith Carter with the opportunity to apply several new technologies and many original integrated design and engineering features, on an accelerated schedule to keep pace with program needs. The result, the premier biocontainment facility of its kind in the world today, will guide the design of future laboratories around the world. Smith Carter, as the high containment specialist consultants was responsible for the design, documentation and construction administration services of the high containment portions (BSL4 and BSL3E) located in Building 18. An accelerated design and construction schedule enabled construction to commence one year after programming started. Building on a depth of past laboratory design experience, Smith Carter conceived, tested and implemented several design and technical innovations to maximize scientific program efficiency.
These included planning innovations, such as flexible animal holding, multiple combinations of BSL3 and BSL4 modules, and shared specimen support space. Expedited mock-ups, more efficient coordination of documents, and BSL4 parametric cost modeling to estimate costs of future laboratories were also among the innovations of the project delivery process. Technical innovations include the use of optical scanners with suits, integrated lightweight air pressure resistant doors, mist spray chemical shower nozzles, integrated service delivery chases (organization of services to minimize penetrations and allow access for repair or maintenance), effluent treatment integral with autoclaves, a scuba compressor breathing air backup system, and visual display messaging boards.